Tasked to fabricate a balustrade section that assimilates what was already on site.
JollyCo firstly measured what was existing in order to find an appropriate solution.
After which a fabricated Stainless Steel SHS frame was fixed with Cedar timber to carefully match the gaps of the existing panels on site.
It was a relatively simple matter of installation after that, fixing the fabricated panel to the painted structural steel work, taking care not to damage any pre existing work whilst fixing in a way that didn’t detract from the workmanship already completed.